FESCO Online Application for New Connection 2024

Starting a new chapter in your life often involves setting up a new home or office. A crucial step in this process is ensuring a seamless connection to electricity. Faisalabad Electric Supply Company (FESCO) has simplified this essential task with its online application system for new connections. This guide will walk you through everything you need to know about the FESCO Online Application for New Connection 2024, including how to apply, the required documents, and the associated charges.

How to Apply for FESCO Online Application for New Connection 2024

Applying for a new FESCO connection online is straightforward and hassle-free. Follow these steps to get started:

1. Visit the FESCO Website

Begin by visiting the official FESCO website. Navigate to the ‘New Connection’ section where you will find the online application form.

2. Fill Out the Online Application

Click on the “FESCO New Connection Form” button to access the application form. Complete all required fields with accurate information.

3. Upload Required Documents

Before submitting your application, make sure to upload the necessary documents:

  • Copy of a Neighboring FESCO Electricity Bill: Helps identify the local grid and tariff category applicable to your area.
  • Copy of Property Document: Verifies ownership or legal occupancy of the property.
  • Attested Copy of Applicant’s CNIC: A government-issued identity document.
  • Attested Copy of Witness’s CNIC: An attested identity document of a person who can vouch for your application.
  • Wiring Contractor’s Test Report: A certified report confirming that the wiring at your premises meets safety standards.

Ensure these documents are available in both print and digital formats (JPG or PDF).

4. Submit the Form

Once the form is filled out and documents are uploaded, submit the form and keep the receipt for future reference.

5. Await FESCO’s Inspection

After submission, FESCO will schedule an inspection of your premises. Make sure that all wiring and installations are compliant with safety standards.

6. Pay the Connection Charges

Following the inspection, you will need to pay the connection charges. The charges vary based on the type of connection and location.

7. Connection Installation and Activation

FESCO will install the connection and activate it after final verification.

Note: It is advisable to complete the submission process using a desktop or laptop for a smoother experience.

Documents Required for FESCO New Connection

To avoid any delays, ensure you have all the required documents ready. Here’s a detailed list:

  • Neighboring FESCO Bill Copy: Needed to determine the local grid and tariff.
  • Property Document Copy: Confirms ownership or legal occupancy.
  • Applicant’s CNIC Copy: Attested for verification.
  • Witness’s CNIC Copy: Another attested ID to support your application.
  • Wiring Contractor’s Test Report: Ensures your wiring meets safety standards.

How to Register for FESCO New Connection Online

You can apply for a new electricity connection in two ways:

1. Collect the Form from Your Local Subdivision

Visit your local FESCO subdivision office to pick up the application form. Fill it out and submit it at the same office.

2. Download the Form from the Website

To download the form:

  1. Click on the “FESCO New Connection Application Form” button at the top of the FESCO website.
  2. Click on “Click to Download Application Form.”
  3. Fill out the downloaded form and submit it to your respective subdivision office.

Submitting Your FESCO Application Online

To submit your application online:

  1. Click on the appropriate button on the FESCO website.
  2. Select your electricity company and subdivision.
  3. Complete all fields in the application form.
  4. Read and agree to the terms and conditions.
  5. Click “Submit” to finalize your application.

FESCO New Connection Charges

FESCO’s connection charges vary depending on the type of connection and the distance from the grid. Here’s a breakdown of the charges:

Connection TypeDetailsAmount (Rs.)
Single Phase (Rural)Up to 40 meters4,000
Single Phase (Rural)41-100 meters4,000 + Rs.200/meter
Single Phase (Rural)101-160 meters16,000 + Rs.250/meter
Single Phase (Urban)Up to 40 meters4,000
Single Phase (Urban)41-100 meters4,000 + Rs.200/meter
Single Phase (Urban)101-160 meters16,000 + Rs.250/meter
Three Phase (Urban & Rural)Up to 40 meters15,000
Three Phase (Urban & Rural)41-100 meters15,000 + Rs.260/meter
Three Phase (Urban & Rural)101-160 meters30,600 + Rs.300/meter
Three Phase (Urban & Rural)160-280 meters48,600 + Rs.340/meter

Conclusion

Applying for a new FESCO connection online in 2024 is a convenient and efficient process. By following the steps outlined in this guide, you can ensure a smooth setup of your electricity connection without the hassle of lengthy manual procedures. Make sure to gather all required documents, follow the online application process, and be aware of the connection charges to avoid any surprises.